Build an OPC UA Tariff-Aware Energy Batch Rescheduler — implementation
Linked challenge: Build an OPC UA Tariff-Aware Energy Batch Rescheduler
Prompt source
implementation81 lines11 sectionsNo variables1 code block
## Build
Parse energy telemetry nodes from OPC UA servers via asyncua against dynamic utility tariff rates. Formulate optimal production run schedules that shift high-draw manufacturing operations out of peak pricing windows.
## User
Plant Energy Manager
## Workflow
1. Extract power draw profiles from normalized OPC UA variable telemetry logs via asyncua.
2. Load multi-tier electricity tariff schedules and factory production order deadlines.
3. Evaluate load shift scenarios against equipment setup constraints and shift hours using Optuna.
4. Produce an energy-optimized shift production schedule with projected cost savings.
## Interface
Comparative timetable visualization showing baseline vs rescheduled batch power curves.
## Data
Generate synthetic JSON fixtures containing simplified synthetic app records for machine kW draw and simulated hourly utility tariffs.
Starter examples below are synthetic. They are not downloaded records.
## Source
[open62541 OPC UA](https://raw.githubusercontent.com/open62541/open62541/master/README.md)
Leverages OPC UA information modeling concepts and telemetry variable nodes referenced in Source 0.
## Tools
optuna, pandas, asyncua.
Optuna handles multi-constraint optimization for scheduling batch operations against tariff windows.
Local lightweight model or hosted API for natural language schedule rationale explanation.
## Deliverables
Submit runnable source, pinned dependencies, setup commands, a working interface, example outputs, and a recorded end-to-end demo. Include tests and an action log.
## Acceptance
- Reduces peak window energy consumption by at least 15% in test runs.
- Preserves all committed customer order batch deadlines without tardiness.
- Generates a structured schedule export for production supervisors.
## Starter Examples
```json
[
{
"input": {
"batch_id": "HEAT-TREAT-88",
"power_draw_kw": 250,
"duration_hours": 3,
"deadline_hour": 18,
"base_cost_per_kwh": 0.12,
"tariff_windows": [
{
"start": 13,
"end": 17,
"cost_per_kwh": 0.42
}
]
},
"expected_output": {
"batch_id": "HEAT-TREAT-88",
"scheduled_start_hour": 10,
"scheduled_end_hour": 13,
"projected_energy_cost": 90,
"avoided_peak_tariff": true
}
},
{
"input": {
"batch_id": "MELT-02",
"power_draw_kw": 400,
"duration_hours": 2,
"deadline_hour": 15,
"base_cost_per_kwh": 0.12,
"tariff_windows": [
{
"start": 13,
"end": 17,
"cost_per_kwh": 0.45
}
]
},
"expected_output": {
"batch_id": "MELT-02",
"scheduled_start_hour": 11,
"scheduled_end_hour": 13,
"projected_energy_cost": 96,
"avoided_peak_tariff": true
}
}
]
```
## Safety
Read-only advisory scheduling; requires plant planner manual sign-off before committing runs to MES.
Use mock external writes. Require human review before any real deployment.