Build a District Cooling Thermal Energy Storage Night-Chilling Optimizer — implementation
Linked challenge: Build a District Cooling Thermal Energy Storage Night-Chilling Optimizer
Prompt source
implementation83 lines11 sectionsNo variables1 code block
## Build
Model district cooling plant chiller load shifting and stratified thermal storage tank charging during off-peak night hours. Reduce peak-demand electrical charges while guaranteeing daytime cooling tonnage.
## User
District Cooling Operations Lead
## Workflow
1. Ingest commercial customer cooling load forecasts and thermal energy storage (TES) state-of-charge.
2. Retrieve time-differentiated electricity tariffs and chiller coefficient-of-performance curves.
3. Formulate optimal nocturnal TES charging sequences using building energy balance principles from EnergyPlus.
4. Produce verified chiller staging plans and thermal reserve reports for operational shift sign-off.
## Interface
A real-time plant load balancing dashboard showing TES thermocline levels, chiller staging Gantt charts, and demand tariff cost deltas.
## Data
Synthesize 24-hour district cooling demand profiles (ton-hours), TES tank capacity limits, and utility tariff rate tables in JSON.
Starter examples below are synthetic. They are not downloaded records.
## Source
[EnergyPlus](https://raw.githubusercontent.com/NREL/EnergyPlus/develop/README.md)
Employs EnergyPlus chilled water loop and thermal storage tank energy balance conventions to model charging and discharging dynamics.
## Tools
dspy, pydantic, fastapi.
Compiles and optimizes structured prompt-based reasoning for complex thermodynamic scheduling decisions under tariff constraints.
Local or hosted LLM with strong math reasoning capabilities for validating thermal balance calculations.
## Deliverables
Submit runnable source, pinned dependencies, setup commands, a working interface, example outputs, and a recorded end-to-end demo. Include tests and an action log.
## Acceptance
- Maintains TES state-of-charge within safe operating bounds without overcharging.
- Demonstrates load shifting away from designated peak electrical tariff hours.
- Outputs hourly chiller stage assignments and expected peak demand cost reductions.
- Enforces mandatory engineering review check prior to transmitting setpoints to plant operators.
## Starter Examples
```json
[
{
"input": {
"plant_id": "DCP-MARINA",
"tes_capacity_ton_hours": 20000,
"initial_tes_storage_ton_hours": 4000,
"max_charge_rate_tons": 2500,
"forecast_peak_cooling_demand_tons": 8000,
"chiller_base_capacity_tons": 6000,
"off_peak_hours": [
0,
1,
2,
3,
4,
5
]
},
"expected_output": {
"recommended_night_charge_ton_hours": 15000,
"projected_peak_coverage_deficit_tons": 0,
"chiller_night_utilization_ratio": 0.83,
"peak_shaving_feasible": true,
"status": "APPROVED_FOR_REVIEW"
}
},
{
"input": {
"plant_id": "DCP-MARINA",
"tes_capacity_ton_hours": 10000,
"initial_tes_storage_ton_hours": 1000,
"max_charge_rate_tons": 1000,
"forecast_peak_cooling_demand_tons": 9000,
"chiller_base_capacity_tons": 6000,
"off_peak_hours": [
2,
3,
4
]
},
"expected_output": {
"recommended_night_charge_ton_hours": 3000,
"projected_peak_coverage_deficit_tons": 2000,
"chiller_night_utilization_ratio": 1,
"peak_shaving_feasible": false,
"status": "SUPPLEMENTAL_CHILLER_REQUIRED"
}
}
]
```
## Safety
Generates advisory scheduling proposals; thermal setpoints require confirmation by qualified plant shift engineers.
Use mock external writes. Require human review before any real deployment.