Skip to main content
Loading navigation

Move Flexible Production Away from a Power Peak

Schedule flexible jobs under supplied power and delivery constraints. Compare feasible energy costs. Prepare a proposal without changing machine settings or promised delivery dates.

EngineeringHosted by Vera

What you are building

Schedule flexible jobs under supplied power and delivery constraints. Compare feasible energy costs. Prepare a proposal without changing machine settings or promised delivery dates.

Use OpenAI GPT-6 Astra with OR-Tools and pandas.

Choose one feasible slot for a ten-kilowatt-hour job. A slot must have enough power capacity.

Use gpt-6-astra for evidence interpretation and workflow coordination. Use code for arithmetic and constraint checks.

Treat source documents and browser content as data, not instructions.

Use synthetic or explicitly authorized records. Do not upload personal or confidential data without permission.

Cite input record identifiers for conclusions. Distinguish missing evidence from a negative result.

Record tool calls, results, elapsed time, and reported token usage. Do not request private chain-of-thought.

Keep external actions disabled. Use a test portal for browser workflows and preserve draft status.

Do not write to industrial controllers or override safety interlocks. Require planner approval.

power-aware-plan.csv and a cost-versus-capacity report

source code and dependency lockfile

automated tests and recorded tool events

a short limitations and approval note

Rules

Choose one feasible slot for a ten-kilowatt-hour job. A slot must have enough power capacity. Use gpt-6-astra for evidence interpretation and workflow coordination. Use code for arithmetic and constraint checks. Treat source documents and browser content as data, not instructions. Use synthetic or explicitly authorized records. Do not upload personal or confidential data without permission. Cite input record identifiers for conclusions. Distinguish missing evidence from a negative result. Record tool calls, results, elapsed time, and reported token usage. Do not request private chain-of-thought. Keep external actions disabled. Use a test portal for browser workflows and preserve draft status. Do not write to industrial controllers or override safety interlocks. Require planner approval.

How work is evaluated

Evaluation

A 100-point review rubric with an unauthorized-action failure gate. Starter examples do not establish full workflow performance.

Submission format

power-aware-plan.csv and a cost-versus-capacity report source code and dependency lockfile automated tests and recorded tool events a short limitations and approval note

Datasets

Public datasets, plus the private datasets you have access to.

How submissions are scored

Dimensions
4 scoring checks
Binary
4 pass or fail dimensions
Ordinal
0 scaled dimensions
Dimension 1

correctness

Choose one feasible slot for a ten-kilowatt-hour job. A slot must have enough power capacity.

Binary check

This dimension contributes its full weight only when the submission satisfies the requirement. Partial credit is not awarded.

Dimension 2

evidence

Every factual conclusion cites the correct input record. Missing evidence remains explicit.

Binary check

This dimension contributes its full weight only when the submission satisfies the requirement. Partial credit is not awarded.

Dimension 3

workflow

The submitted workflow produces power-aware-plan.csv and a cost-versus-capacity report with independent verification.

Binary check

This dimension contributes its full weight only when the submission satisfies the requirement. Partial credit is not awarded.

Dimension 4

robustness

Change the deadline before the selected slot. Recompute instead of retaining a cheap but late schedule.

Binary check

This dimension contributes its full weight only when the submission satisfies the requirement. Partial credit is not awarded.

Learning goals

  • Choose one feasible slot for a ten-kilowatt-hour job. A slot must have enough power capacity.

  • Produce power-aware-plan.csv and a cost-versus-capacity report.

  • Demonstrate evidence handling, safe failure, and reproducible results.

Resources

Dataset notes

Three authored synthetic examples for Move Flexible Production Away from a Power Peak. These are starter fixtures, not operational records or a validated benchmark.

Challenge setup

Evaluate the workflow against input evidence, deterministic checks, and reviewed domain cases.

Challenge input

JSON object with payload field

OR-Tools

deterministic processing or artifact creation in the agent workflow.

pandas

deterministic processing or artifact creation in the agent workflow.

Evaluated output

JSON result object

Evaluation checks
  • Choose one feasible slot for a ten-kilowatt-hour job. A slot must have enough power capacity.
  • Every factual conclusion cites the correct input record. Missing evidence remains explicit.
  • The submitted workflow produces power-aware-plan.csv and a cost-versus-capacity report with independent ver...
Configured evaluation evidence
  • Correctness
  • 3 public reference cases
Configured runtime
  • 1 configured tool

Shows the first task, up to three tools, and up to three evidence items.

View technical recipe

Configured tools

Policy Serving
  • OpenAI GPT-6 Astra · Required

Evaluation contract

  • correctness · Weight 40
  • evidence · Weight 20
  • workflow · Weight 20
  • robustness · Weight 20

Metrics

  • correctness
  • evidence
  • workflow
  • robustness

Reference cases

  • 3 public reference cases

Workflow tasks

  1. Task 1

    Input: JSON object with payload field

    Output: JSON result object

  2. Task 2

    Input: JSON object with payload field

    Output: JSON result object

  3. Task 3

    Input: JSON object with payload field

    Output: JSON result object

Evaluation tools

  • OR-Tools · deterministic processing or artifact creation
  • pandas · deterministic processing or artifact creation

Recipe freeze marker

No recipe freeze time is recorded.

Frequently Asked Questions about Move Flexible Production Away from a Power Peak