Build an IFC Demolition Material Circularity Auditor
Inspect structural elements in architectural IFC files using IfcOpenShell to calculate salvageable timber and masonry quantities. Produce standardized circularity manifests for deconstruction contractors.
What you are building
The core problem, expected build, and operating context for this challenge.
Inspect structural elements in architectural IFC files using IfcOpenShell to calculate salvageable timber and masonry quantities. Produce standardized circularity manifests for deconstruction contractors.
Demolition and Salvage Coordinator
Import an IFC model representing a commercial building planned for deconstruction.
Query IfcWall, IfcBeam, and IfcColumn elements to extract material layer data.
Calculate total component volumes and cross-reference material recyclability ratings.
Compile a deconstruction inventory manifest highlighting reusable elements.
Material recovery dashboard listing salvaged volume metrics, demolition sequencing recommendations, and download buttons.
Clone public IFC samples from the buildingSMART international model sample repository. Starter examples below are synthetic. They are not downloaded records.
IfcOpenShell Leverages IfcOpenShell Python to read material constituent sets and element quantities from structural entities.
haystack, ifcopenshell, pandas. Haystack provides document extraction pipelines and question-answering retrieval over architectural salvage specifications. Cloud-hosted general language model capable of parsing technical deconstruction documentation and circular economy criteria.
Submit runnable source, pinned dependencies, setup commands, a working interface, example outputs, and a recorded end-to-end demo. Include tests and an action log.
Processes material layer thicknesses and calculates total wall and beam volumes.
Categorizes materials into direct reuse, recycling, or disposal streams.
Outputs a deconstruction recovery manifest with embodied carbon offset metrics.
```json [ { "input": { "project_name": "Warehouse Rehab Project", "elements": [ { "id": "Beam_Glulam_01", "entity": "IfcBeam", "material": "Glued Laminated Timber", "volume_m3": 1.25, "fastener_type": "Bolted" }, { "id": "Wall_Brick_01", "entity": "IfcWallStandardCase", "material": "Clay Masonry", "volume_m3": 8.4, "mortar_type": "Lime" } ] }, "expected_output": { "summary": { "total_elements": 2, "high_salvage_yield_m3": 9.65, "diverted_from_landfill_pct": 95 }, "manifest": [ { "id": "Beam_Glulam_01", "recovery_action": "Direct Reuse", "condition_notes": "Unboltable without structural damage" }, { "id": "Wall_Brick_01", "recovery_action": "Reclaimed Brick Cleaning", "condition_notes": "Lime mortar allows clean brick recovery" } ] } }, { "input": { "project_name": "Office Annex", "elements": [ { "id": "Panel_Asphalt_01", "entity": "IfcCovering", "material": "Hazardous Bitumen Board", "volume_m3": 0.5, "fastener_type": "Adhesive" } ] }, "expected_output": { "summary": { "total_elements": 1, "high_salvage_yield_m3": 0, "diverted_from_landfill_pct": 0 }, "manifest": [ { "id": "Panel_Asphalt_01", "recovery_action": "Hazardous Disposal", "condition_notes": "Contains regulated adhesive; non-recyclable" } ] } } ] ```
Circularity estimates are indicative guidelines. Hazardous material abatement must be inspected on-site by certified personnel. Use mock external writes. Require human review before any real deployment.
Participation guide
Circularity estimates are indicative guidelines. Hazardous material abatement must be inspected on-site by certified personnel. Use mock external writes and human review.
How work is evaluated
Processes material layer thicknesses and calculates total wall and beam volumes. Categorizes materials into direct reuse, recycling, or disposal streams. Outputs a deconstruction recovery manifest with embodied carbon offset metrics.
Runnable source, pinned dependencies, setup commands, working interface, example outputs, recorded demo, tests, and action logs.
Challenge datasets
Public datasets, plus the private datasets you have access to.
How submissions are scored
These dimensions define what the evaluator checks and which criteria separate a passable run from a strong one.
Complete workflow
Import an IFC model representing a commercial building planned for deconstruction. Query IfcWall, IfcBeam, and IfcColumn elements to extract material layer data. Calculate total component volumes and cross-reference material recyclability ratings. Compile a deconstruction inventory manifest highlighting reusable elements.
Missing or incorrect.
Partly complete, with documented gaps.
Complete, with reproducible evidence.
Correctness and evidence
Processes material layer thicknesses and calculates total wall and beam volumes. Categorizes materials into direct reuse, recycling, or disposal streams. Outputs a deconstruction recovery manifest with embodied carbon offset metrics.
Missing or incorrect.
Partly complete, with documented gaps.
Complete, with reproducible evidence.
Review interface
Material recovery dashboard listing salvaged volume metrics, demolition sequencing recommendations, and download buttons.
Missing or incorrect.
Partly complete, with documented gaps.
Complete, with reproducible evidence.
Safe execution
Circularity estimates are indicative guidelines. Hazardous material abatement must be inspected on-site by certified personnel.
This dimension contributes its full weight only when the submission satisfies the requirement. Partial credit is not awarded.
What you should walk away with
Import an IFC model representing a commercial building planned for deconstruction.
Query IfcWall, IfcBeam, and IfcColumn elements to extract material layer data.
Calculate total component volumes and cross-reference material recyclability ratings.
Compile a deconstruction inventory manifest highlighting reusable elements.
Reference links and supporting material
Clone public IFC samples from the buildingSMART international model sample repository. Supplied starter examples are synthetic, not source extracts.
Challenge setup
Configuration summary for this challenge.
Challenge input
Input details are not configured.
Haystack
Framework
Evaluated output
No output checks are configured.
- Import an IFC model representing a commercial building planned for deconstruction. Query IfcWall, IfcBeam,...
- Processes material layer thicknesses and calculates total wall and beam volumes. Categorizes materials into...
- Material recovery dashboard listing salvaged volume metrics, demolition sequencing recommendations, and dow...
- 2 public reference cases
- 1 configured tool
Summary shows the first task, up to three tools, and up to three evidence items. Open the technical recipe to view all configured items.
View technical recipe
Configured tools
- Haystack · Optional
Evaluation contract
- Complete workflow · Weight 40
- Correctness and evidence · Weight 30
- Review interface · Weight 20
- Safe execution · Weight 10
Reference cases
- 2 public reference cases
Workflow tasks
No workflow tasks are configured.
Recipe freeze marker
No recipe freeze time is recorded.