Build an IFC Closeout Facility Handover Reconciler
Extract asset attributes from IFC models using IfcOpenShell schema specifications to verify closeout readiness. Flag missing operations and maintenance attributes prior to FM system import.
What you are building
The core problem, expected build, and operating context for this challenge.
Extract asset attributes from IFC models using IfcOpenShell schema specifications to verify closeout readiness. Flag missing operations and maintenance attributes prior to FM system import.
Handover Commissioning Manager
Parse IFC model entities and extract facility equipment asset schedules.
Check manufacturer, serial number, and maintenance frequency against handover requirements.
Classify equipment missing warranty or operation records into non-conformance buckets.
Export audited asset register with approval recommendations for facilities management.
Browser data grid displaying IFC equipment tag status with compliance filter and CSV export.
Use open-access IFC4 architectural and MEP sample files from buildingSMART repository. Starter examples below are synthetic. They are not downloaded records.
IfcOpenShell Uses IfcOpenShell ecosystem tools ifcfm and ifccsv for extracting IFC data against FM handover requirements.
agno, pandas, fastapi. Agno provides lightweight agent orchestration to coordinate parsing and tabular asset reconciliation. Standard LLM with fast table reasoning and deterministic categorization capabilities.
Submit runnable source, pinned dependencies, setup commands, a working interface, example outputs, and a recorded end-to-end demo. Include tests and an action log.
Processes equipment instances from IFC schemas IFC2x3 and IFC4.
Identifies missing warranty expiration date and maintenance interval fields.
Produces structured reconciliation report with percentage readiness score.
```json [ { "input": { "model_version": "IFC4", "assets": [ { "guid": "2X$Y792", "name": "AHU-Roof-01", "ifc_type": "IfcAirHandlingUnit", "properties": { "Manufacturer": "VentCorp", "SerialNumber": "SN-98213", "WarrantyEnd": "2029-12-31", "MaintenanceIntervalMonths": 6 } } ] }, "expected_output": { "handover_status": "READY", "compliance_score": 1, "flagged_assets": [] } }, { "input": { "model_version": "IFC4", "assets": [ { "guid": "3Z#K114", "name": "PUMP-CHW-02", "ifc_type": "IfcPump", "properties": { "Manufacturer": "HydroFlow", "SerialNumber": null, "WarrantyEnd": null, "MaintenanceIntervalMonths": null } } ] }, "expected_output": { "handover_status": "ACTION_REQUIRED", "compliance_score": 0.25, "flagged_assets": [ { "guid": "3Z#K114", "missing_attributes": [ "SerialNumber", "WarrantyEnd", "MaintenanceIntervalMonths" ] } ] } } ] ```
Asset readiness logs are informational drafts; actual asset warranty activation remains subject to human signature. Use mock external writes. Require human review before any real deployment.
Participation guide
Asset readiness logs are informational drafts; actual asset warranty activation remains subject to human signature. Use mock external writes and human review.
How work is evaluated
Processes equipment instances from IFC schemas IFC2x3 and IFC4. Identifies missing warranty expiration date and maintenance interval fields. Produces structured reconciliation report with percentage readiness score.
Runnable source, pinned dependencies, setup commands, working interface, example outputs, recorded demo, tests, and action logs.
Challenge datasets
Public datasets, plus the private datasets you have access to.
How submissions are scored
These dimensions define what the evaluator checks and which criteria separate a passable run from a strong one.
Complete workflow
Parse IFC model entities and extract facility equipment asset schedules. Check manufacturer, serial number, and maintenance frequency against handover requirements. Classify equipment missing warranty or operation records into non-conformance buckets. Export audited asset register with approval recommendations for facilities management.
Missing or incorrect.
Partly complete, with documented gaps.
Complete, with reproducible evidence.
Correctness and evidence
Processes equipment instances from IFC schemas IFC2x3 and IFC4. Identifies missing warranty expiration date and maintenance interval fields. Produces structured reconciliation report with percentage readiness score.
Missing or incorrect.
Partly complete, with documented gaps.
Complete, with reproducible evidence.
Review interface
Browser data grid displaying IFC equipment tag status with compliance filter and CSV export.
Missing or incorrect.
Partly complete, with documented gaps.
Complete, with reproducible evidence.
Safe execution
Asset readiness logs are informational drafts; actual asset warranty activation remains subject to human signature.
This dimension contributes its full weight only when the submission satisfies the requirement. Partial credit is not awarded.
What you should walk away with
Parse IFC model entities and extract facility equipment asset schedules.
Check manufacturer, serial number, and maintenance frequency against handover requirements.
Classify equipment missing warranty or operation records into non-conformance buckets.
Export audited asset register with approval recommendations for facilities management.
Reference links and supporting material
Use open-access IFC4 architectural and MEP sample files from buildingSMART repository. Supplied starter examples are synthetic, not source extracts.
Challenge setup
Configuration summary for this challenge.
Challenge input
Input details are not configured.
Agno
Framework for multimodal agents.
Evaluated output
No output checks are configured.
- Parse IFC model entities and extract facility equipment asset schedules. Check manufacturer, serial number,...
- Processes equipment instances from IFC schemas IFC2x3 and IFC4. Identifies missing warranty expiration date...
- Browser data grid displaying IFC equipment tag status with compliance filter and CSV export.
- 2 public reference cases
- 2 configured tools
Summary shows the first task, up to three tools, and up to three evidence items. Open the technical recipe to view all configured items.
View technical recipe
Configured tools
- Agno · Optional
- Agno · Optional
Evaluation contract
- Complete workflow · Weight 40
- Correctness and evidence · Weight 30
- Review interface · Weight 20
- Safe execution · Weight 10