Build a Solar Farm Outage and Inverter Spares Coordinator

Coordinate utility-scale solar inverter scheduled outages against planned generation losses and spare-parts inventory. Calculate revenue loss impacts and compile verified technician maintenance dossiers before staging field repairs.

EngineeringHosted by Vera
Challenge brief

What you are building

The core problem, expected build, and operating context for this challenge.

Coordinate utility-scale solar inverter scheduled outages against planned generation losses and spare-parts inventory. Calculate revenue loss impacts and compile verified technician maintenance dossiers before staging field repairs.

Renewable plant operations planner

Ingest inverter telemetry, lead times, and solar irradiance profiles using pvlib simulation models.

Simulate hourly power output loss for candidate outage windows across available spare part delivery dates.

Calculate estimated lost generation megawatt-hours and check warehouse buffer availability for critical components.

Assemble a structured outage coordination manifest with selected maintenance windows for human engineer sign-off.

Web dashboard showing inverter health, solar production curves, spare part delivery timelines, and outage approval queues.

Generate synthetic hourly irradiance time-series formatted via pvlib model conventions, paired with normalized inverter bill-of-materials and warehouse records. Starter examples below are synthetic. They are not downloaded records.

PVLib solar modeling Applies pvlib Python performance modeling concepts for simulating photovoltaic generation profiles and calculating output loss during downtime.

pydantic-ai, pvlib, pandas. Ensures structured validation of technical spare-part schemas and typed solar maintenance outage payloads. Fast hosted LLM with strong JSON adherence for technical schedule generation via standard cloud API.

Submit runnable source, pinned dependencies, setup commands, a working interface, example outputs, and a recorded end-to-end demo. Include tests and an action log.

Evaluates pvlib generation loss across at least two alternate maintenance outage time slots.

Validates spare-part availability and lead-time constraints against warehouse inventory schema.

Produces a verified outage schedule manifest requiring explicit human engineer approval before simulated write.

```json [ { "input": { "inverter_id": "INV-SOUTH-04", "capacity_kw": 1250, "required_part": "IGBT-MODULE-1200V", "stock_available": 2, "proposed_window_start": "2025-06-15T04:00:00Z", "duration_hours": 6, "projected_irradiance_wm2": [ 120, 450, 780, 920, 850, 610 ] }, "expected_output": { "status": "APPROVED_FOR_REVIEW", "inverter_id": "INV-SOUTH-04", "parts_cleared": true, "estimated_loss_kwh": 3730, "recommended_window": "2025-06-15T04:00:00Z", "engineer_signoff_required": true } }, { "input": { "inverter_id": "INV-NORTH-01", "capacity_kw": 2000, "required_part": "DC-BUS-CAPACITOR-PACK", "stock_available": 0, "proposed_window_start": "2025-06-16T08:00:00Z", "duration_hours": 4, "projected_irradiance_wm2": [ 900, 950, 980, 940 ] }, "expected_output": { "status": "BLOCKED_PARTS_UNAVAILABLE", "inverter_id": "INV-NORTH-01", "parts_cleared": false, "estimated_loss_kwh": 7540, "recommended_window": null, "engineer_signoff_required": true } } ] ```

Simulates all maintenance schedule changes without directly triggering physical grid interlocks or inverter breakers. Use mock external writes. Require human review before any real deployment.

Rules

Participation guide

Simulates all maintenance schedule changes without directly triggering physical grid interlocks or inverter breakers. Use mock external writes and human review.

Delivery guide

How work is evaluated

Evaluation

Evaluates pvlib generation loss across at least two alternate maintenance outage time slots. Validates spare-part availability and lead-time constraints against warehouse inventory schema. Produces a verified outage schedule manifest requiring explicit human engineer approval before simulated write.

Submission format

Runnable source, pinned dependencies, setup commands, working interface, example outputs, recorded demo, tests, and action logs.

Datasets

Challenge datasets

Public datasets, plus the private datasets you have access to.

Evaluation rubric

How submissions are scored

These dimensions define what the evaluator checks and which criteria separate a passable run from a strong one.

Dimensions
4 scoring checks
Binary
1 pass or fail dimensions
Ordinal
3 scaled dimensions
Dimension 1

Complete workflow

Ingest inverter telemetry, lead times, and solar irradiance profiles using pvlib simulation models. Simulate hourly power output loss for candidate outage windows across available spare part delivery dates. Calculate estimated lost generation megawatt-hours and check warehouse buffer availability for critical components. Assemble a structured outage coordination manifest with selected maintenance windows for human engineer sign-off.

Score scale
012
Score 0

Missing or incorrect.

Score 1

Partly complete, with documented gaps.

Score 2

Complete, with reproducible evidence.

Dimension 2

Correctness and evidence

Evaluates pvlib generation loss across at least two alternate maintenance outage time slots. Validates spare-part availability and lead-time constraints against warehouse inventory schema. Produces a verified outage schedule manifest requiring explicit human engineer approval before simulated write.

Score scale
012
Score 0

Missing or incorrect.

Score 1

Partly complete, with documented gaps.

Score 2

Complete, with reproducible evidence.

Dimension 3

Review interface

Web dashboard showing inverter health, solar production curves, spare part delivery timelines, and outage approval queues.

Score scale
012
Score 0

Missing or incorrect.

Score 1

Partly complete, with documented gaps.

Score 2

Complete, with reproducible evidence.

Dimension 4

Safe execution

Simulates all maintenance schedule changes without directly triggering physical grid interlocks or inverter breakers.

Binary check

This dimension contributes its full weight only when the submission satisfies the requirement. Partial credit is not awarded.

Learning goals

What you should walk away with

  • Ingest inverter telemetry, lead times, and solar irradiance profiles using pvlib simulation models.

  • Simulate hourly power output loss for candidate outage windows across available spare part delivery dates.

  • Calculate estimated lost generation megawatt-hours and check warehouse buffer availability for critical components.

  • Assemble a structured outage coordination manifest with selected maintenance windows for human engineer sign-off.

Resources and assets

Reference links and supporting material

Dataset notes

Generate synthetic hourly irradiance time-series formatted via pvlib model conventions, paired with normalized inverter bill-of-materials and warehouse records. Supplied starter examples are synthetic, not source extracts.

Challenge setup

Configuration summary for this challenge.

Challenge input

Input details are not configured.

Pydantic AI

Typed Python agent framework.

Evaluated output

No output checks are configured.

Evaluation checks
  • Ingest inverter telemetry, lead times, and solar irradiance profiles using pvlib simulation models. Simulat...
  • Evaluates pvlib generation loss across at least two alternate maintenance outage time slots. Validates spar...
  • Web dashboard showing inverter health, solar production curves, spare part delivery timelines, and outage a...
Configured evaluation evidence
  • 2 public reference cases
Configured runtime
  • 2 configured tools

Summary shows the first task, up to three tools, and up to three evidence items. Open the technical recipe to view all configured items.

View technical recipe

Configured tools

Action Space
  • Pydantic AI · Optional
Orchestration
  • Pydantic AI · Optional

Evaluation contract

  • Complete workflow · Weight 40
  • Correctness and evidence · Weight 30
  • Review interface · Weight 20
  • Safe execution · Weight 10

Reference cases

  • 2 public reference cases