Build a Desalination Plant Reverse Osmosis Membrane Cleaning Scheduler
Monitor reverse osmosis membrane pressure differentials and permeate quality to schedule clean-in-place operations. Optimize cleaning chemical usage while maintaining continuous baseline potable water production across the plant.
What you are building
The core problem, expected build, and operating context for this challenge.
Monitor reverse osmosis membrane pressure differentials and permeate quality to schedule clean-in-place operations. Optimize cleaning chemical usage while maintaining continuous baseline potable water production across the plant.
Desalination Plant Maintenance Manager
Ingest SWRO membrane pressure drop telemetry and permeate conductivity readings.
Evaluate membrane fouling rates using WaterTAP module performance models.
Schedule staggered clean-in-place cycles across multiple RO trains to avoid complete shutdown.
Generate a chemical dosing and train isolation manifest for operators.
Maintenance scheduling dashboard highlighting membrane fouling trends and recommended chemical wash timelines.
Utilize WaterTAP RO flowsheet modeling data to generate synthetic membrane fouling degradation profiles. Starter examples below are synthetic. They are not downloaded records.
WaterTAP treatment modeling Applies WaterTAP membrane unit models to correlate pressure differential increases with expected fouling severity.
agno, pandas, fastapi. Agno provides agentic reasoning capabilities to evaluate multi-train maintenance schedules against continuous production constraints. Local or cloud LLM capable of evaluating tabular telemetry logic and generating valid JSON maintenance manifests.
Submit runnable source, pinned dependencies, setup commands, a working interface, example outputs, and a recorded end-to-end demo. Include tests and an action log.
Calculates membrane fouling progression from differential pressure telemetry.
Determines the optimal clean-in-place cycle timing based on a pressure threshold limit.
Ensures scheduled RO train outages maintain plant production constraints.
Generates a human-reviewable chemical cleaning dispatch schedule.
```json [ { "input": { "train_id": "RO-TRAIN-A", "delta_p_bar": 2.8, "baseline_delta_p_bar": 1.5, "plant_demand_m3h": 5000 }, "expected_output": { "fouling_status": "SEVERE", "cip_required": true, "pressure_diff_bar": 1.3, "chemical_dosage_liters": 130, "_note": "Simplified synthetic app record; chemical_dosage_liters = pressure_diff_bar * 100" } }, { "input": { "train_id": "RO-TRAIN-B", "delta_p_bar": 1.7, "baseline_delta_p_bar": 1.5, "plant_demand_m3h": 5000 }, "expected_output": { "fouling_status": "NORMAL", "cip_required": false, "pressure_diff_bar": 0.2, "chemical_dosage_liters": 0, "_note": "Simplified synthetic app record" } } ] ```
Maintenance schedules are advisory and require human review by a certified chemical engineer before executing physical clean-in-place operations. Use mock external writes. Require human review before any real deployment.
Participation guide
Maintenance schedules are advisory and require human review by a certified chemical engineer before executing physical clean-in-place operations. Use mock external writes and human review.
How work is evaluated
Calculates membrane fouling progression from differential pressure telemetry. Determines the optimal clean-in-place cycle timing based on a pressure threshold limit. Ensures scheduled RO train outages maintain plant production constraints. Generates a human-reviewable chemical cleaning dispatch schedule.
Runnable source, pinned dependencies, setup commands, working interface, example outputs, recorded demo, tests, and action logs.
Challenge datasets
Public datasets, plus the private datasets you have access to.
How submissions are scored
These dimensions define what the evaluator checks and which criteria separate a passable run from a strong one.
Complete workflow
Ingest SWRO membrane pressure drop telemetry and permeate conductivity readings. Evaluate membrane fouling rates using WaterTAP module performance models. Schedule staggered clean-in-place cycles across multiple RO trains to avoid complete shutdown. Generate a chemical dosing and train isolation manifest for operators.
Missing or incorrect.
Partly complete, with documented gaps.
Complete, with reproducible evidence.
Correctness and evidence
Calculates membrane fouling progression from differential pressure telemetry. Determines the optimal clean-in-place cycle timing based on a pressure threshold limit. Ensures scheduled RO train outages maintain plant production constraints. Generates a human-reviewable chemical cleaning dispatch schedule.
Missing or incorrect.
Partly complete, with documented gaps.
Complete, with reproducible evidence.
Review interface
Maintenance scheduling dashboard highlighting membrane fouling trends and recommended chemical wash timelines.
Missing or incorrect.
Partly complete, with documented gaps.
Complete, with reproducible evidence.
Safe execution
Maintenance schedules are advisory and require human review by a certified chemical engineer before executing physical clean-in-place operations.
This dimension contributes its full weight only when the submission satisfies the requirement. Partial credit is not awarded.
What you should walk away with
Ingest SWRO membrane pressure drop telemetry and permeate conductivity readings.
Evaluate membrane fouling rates using WaterTAP module performance models.
Schedule staggered clean-in-place cycles across multiple RO trains to avoid complete shutdown.
Generate a chemical dosing and train isolation manifest for operators.
Reference links and supporting material
Utilize WaterTAP RO flowsheet modeling data to generate synthetic membrane fouling degradation profiles. Supplied starter examples are synthetic, not source extracts.
Challenge setup
Configuration summary for this challenge.
Challenge input
Input details are not configured.
Agno
Framework for multimodal agents.
Evaluated output
No output checks are configured.
- Ingest SWRO membrane pressure drop telemetry and permeate conductivity readings. Evaluate membrane fouling...
- Calculates membrane fouling progression from differential pressure telemetry. Determines the optimal clean-...
- Maintenance scheduling dashboard highlighting membrane fouling trends and recommended chemical wash timelines.
- 2 public reference cases
- 2 configured tools
Summary shows the first task, up to three tools, and up to three evidence items. Open the technical recipe to view all configured items.
View technical recipe
Configured tools
- Agno · Optional
- Agno · Optional
Evaluation contract
- Complete workflow · Weight 40
- Correctness and evidence · Weight 30
- Review interface · Weight 20
- Safe execution · Weight 10
Reference cases
- 2 public reference cases
Workflow tasks
No workflow tasks are configured.
Recipe freeze marker
No recipe freeze time is recorded.